Project Examples

Let us help you with your next steps...

01

Row of tiles with the last one being placed to represent using Lab2POC in fractional roles to complete the value chain.

Fractional Roles

  • Business development and pitching - Batteries

  • Safety, Health, Environment & Quality Manager - Batteries

  • Leading materials kilo scale process R&D teams, Batteries/Chemicals

  • China - On-site production trouble shooting, 3 week blocks

  • Innovate & Horizon Grants - Programme management (9+ Projects)

  • Technical Writing - Process documentation, Technical transfer packs

  • Quality systems management - Batteries and Pharma

  • IT - Supported ERP installations and implemented electronic training record (Learning management systems) 

  • Risk assessment and HAZOP support

02

Leadership Roles

  • Operations - Leading forming, building and leading operations teams up to 40 heads in two battery start ups.

  • Technical - Mentoring and coaching research teams, driving commercial innovation, quality and process development.

  • Commercial - Strategy development, Supply chain development and customer exploration

  • Technology transfer - Preparing for and leading transfers to China, India, Brazil and EU

  • Collaborations, Grant writing, coordination, programme and project management with industrial and academic partners

A team of preffessionals standing at a wall covered in designs working on a project together with leadership supplied from Lab2Poc

03

Feasibility study representing a front end loading study - assessment of the practicality of a proposed project or change

Front End Loading Studies

Front end loading studies have been completed for multiple battery start-ups, providing detailed justifications and plans that de-risk investment.

​

Notable projects include a cell manufacturing facility in Belo Horizonte, Brazil, Electrode manufacturing at Kenfig, South Wales, Pilot scale battery materials facilities in Oxfordshire. Several have been successfully completed and are operational.

04

Lean Six Sigma

Application of Lean Six Sigma principles to the analysis of sales force data. Produced insights leading to organisational changes with improved results. Sales strategy was adapted to better fit customers in different parts of a vertically integrated global organisation, a one size fits all approach was not working and it showed in the data.  Black Belt pharmaceuticals & Batteries.

Wall of ideas on post it notes representing a lean six sigma root cause analysis event

05

pharmaceutical factory equipment, mixing tank on production line representing Lab2Poc looking after your capital projects

Capital Projects - Facilities & Equipment

Programme Management

  • FDA/MHRA approved retro fit of existing pharmaceutical API facility enabling potent compound manufacture. 30+ Contractors, Equipment and facility, design and qualification, cGMP, GEP, Operational handover.

  • Transformed warehousing into battery laboratories with coating lines and automated assembly lines.

  • Modified process plant with new heating/cooling systems, abatement systems, CIP systems, Clean and Dry rooms

  • Laboratories, kilo labs, pilot manufacture  